Phone: +353 49 4355910 | Email: info@edgeautomation.ie

Professional Services

Edge Automation Professional Services - Bronze Package

Bronze Package

An off-site service designed to give you insight into the cooling performance of your conceptual designs.

Future Facilities Example Project

  • Client: DC Consultant
  • Project: Cooling and IT layout - Proof of Concept
  • Key Findings: Control system design was flawed. Site and design constraints meant a number of alternatives were reviewed and a working solution was found.
  • Project Timeline: 2 weeks


Contact Us

Edge Automation Professional Services - Silver Package

Silver Package

Our entry-level on-site service. We make a brief site visit and provide you with room-level cooling system performance analysis, along with our observations from the data center floor.

Future Facilities Example Project

  • Client: DC Consultant
  • Project: Survey as-built shell, evaluate IT layout and cooling design
  • Key Findings: Cooling pipe routes were found to adversely impact ACU supply airflow. ACUs were relocated to mitigate this effect. Colocation cages led to warm air build up and higher IT inlet temperatures. Alterations were recommended to restore expected performance.
  • Project Timeline: 3 weeks


Contact Us

Edge Automation Professional Services - Gold Package

Gold Package

We inspect your data center in detail all the way up to the racks, so you can see precisely how air is delivered from your air handlers to your rack inlets. Verified through calibration.

Future Facilities Example Project

  • Client: Aviation Industry
  • Project: Increase safety margin of cooling system through improvements to air supply path.
  • Key Findings: Cooling delivery paths were safely brought back into a managed state, after the insight gained from an airflow analysis provided both justification for, and risk assessement of, the remedial options. Additional infrastructure was avoided.
  • Project Timeline: 1 month


Contact Us

Edge Automation Professional Services - Platinum Package

Platinum Package

Our premium offering. We survey your entire data center, going all the way inside the racks to give you a complete picture of cooling performance.

Future Facilities Example Project

  • Client: Global Bank
  • Project: Assess cooling performance. Identify areas to obtain operational and efficiency improvements.
  • Key Findings: Maximum equipment temperatures were lowered through alterations to internal rack configurations, and supply air pressures in contained cold aisles were rebalanced in preparation for large equipment deployments.
  • Project Timeline: 2 months


Contact Us

Edge Automation Professional Services - External Package

External Package

Understand the impact of different ambient conditions on your external plant. Identify worst-case wind directions, contaminant pathways, risk of temperature and humidity recirculation, and more.

Future Facilities Example Project

  • Client: Design Consultant
  • Project: Free-cooling external design analysis.
  • Key Findings: Free-cooled units suffered from external recirculation, limiting peak cooling performance. Free-cooled units were lab tested to reconfirm nominal performance. Updated building design options were proposed and performance was evaluated.
  • Project Timeline: 2 months


Contact Us